100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance

Product Details
Customization: Available
Type: Gravity Separator
Voltage: 380V
Still deciding? Get samples of US$ 12000/set
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company
Secured Trading Service
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
In-stock Capacity
The supplier has In-stock capacity
Standardized quality control
The supplier has a complete and standardized quality control process, check the Audit Report for more information
Product Certification
The supplier's products already have relevant certification qualifications, including:
CE
to see all verified strength labels (21)
  • 100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance
  • 100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance
  • 100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance
  • 100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance
  • 100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance
  • 100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance
Find Similar Products
  • Overview
  • Company Profile
  • Product Description
  • Product Parameters
  • Our Advantages
  • Packaging & Shipping
  • After Sales Service
  • FAQ
Overview

Basic Info.

Model NO.
ET-D8
Material
Steel
Material Feature
Rust-Proof
Certification
ISO9001:2008
Energy Saving
Energy Saving
Warranty
1 Year
Color
Customized
Customized
Customized
Condition
New
Mesh Material
High Manganese Steel Wire
Platform Materials
4mm Anti-Skateboard
Shifting Unit
Wheel
150through Particle Size
200mm
Application
Sand Gold Ore Extraction
Working Capacity
5-400tph
Size of Roller Screen
as Customized
Working Form
Chain Drive
Through Particle Size
150mm
Price
Fob
Number of Wheels
8
Logo
as Customized
Transport Package
Container
Specification
10.5*3*3.2m
Trademark
ETERNE
Origin
Shandong, China
HS Code
8474100000
Production Capacity
5000 Sets Per Year

Packaging & Delivery

Package Size
850.00cm * 330.00cm * 250.00cm
Package Gross Weight
5000.000kg

Product Description

100 Ton Dry Blower for Gold Mining with High Efficiency and Reliable Performance
Company Profile

100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance
Company Introduction

Shandong Eterne Machinery Co., Ltd. is a large and leading gold mining service company. We are dedicated and committed to provide effective and cost-friendly solutions for gold mining industry, which includes various types of equipment like gold trommel, centrifugal concentrator, vibrating sluice, clay washer, vibrating screen, gold dredger and etc. We have gained a reputation from both domestic clients and international clients for a long time.

We have extensive export experience to over 50 countries and our products are mainly exported to Russia, Ghana, Kyrgyzstan, Sudan, Suriname, Guyana, Ecuador, Philippines, Indonesia, Myanmar, North Korea, Peru and etc. We are more than pleased to provide tailored mining solutions for each of our clients from all over the world according to their own mining conditions and requirements.
Product Description

Gold Dry Blower Introduction:

Dry Blower is a method to extract gold particles from dry soil without the use of water. A machine specialized to use this method is known as a dry blower. It is a form of winnowing.

100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance

Product Parameters
 
We provide three types of normal gold dry blower and can also design and manufacture based on special requirements and needs. And any other related supportive gold mining machines can be combined with gold dry blower as well.
Model ET-D2 ET-D4 ET-D8
Machine Size 1350*550*1500 2700*1100*3000 5400*2200*6000
Processing Capacity 1-3 tph 2-6 tph 4-12 tph
Motor Power 2 kw 4 kw 8 kw
Noise <85 dB(A) <85 dB(A) <85 dB(A)
Blower Capacity 2000 m3/h 4000 m3/h 8000 m3/h
Weight(kg) 30 KG 60 KG 120 KG
Pipe Material PVC Tube PVC Tube PVC Tube
Box Material Stainless Steel Stainless Steel Stainless Steel
100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance
Our Advantages
Aadvantages:

1.  High Processing Capacity, capable of efficiently processing up to 100 tons of material per hour, making it ideal for large-scale gold mining operations.
2.  Advanced Separation Technology, utilizes cutting-edge air separation techniques to ensure precise and efficient recovery of valuable minerals, minimizing loss.
3.  Energy Efficiency, designed with energy-saving features to reduce opertional costs and enhance overall efficiency.
4.  Durable and Robust Construction, built with high-quality materials to withstand harsh mining conditions, ensuring long-lasting performance and minimal maintenance.
5.  User-Friendly Operation, easy to install and operate, with intuitive controls that simplify the separation process, allowing for quicker setup and reduced downtime.

 
Case

Our various types of gold mining equipment have sold to over 50 countries and earned prestige from both domestic clients and overseas since our gold mining equipment has always provided reliable and cost-friendly gold mining solutions for each of our clients. And one important part of our company culture is that we are always looking for a win-win game between our company and our clients. And we are dedicated to providing the best available gold mining solutions for our clients' business success
100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance
 
Packaging & Shipping

Delivery Time:

7-30 days, depend on orders;

1,LCL : Wood case or channel steel frame with iron piece 
2,FCL : Nude and firmed in container (20GP, 40GP, 40HQ)
100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance
After Sales Service

After-Sales Service

1. Design outlet with 3D drawing photo.
2. Producing according to the design.
3. Inspection and testing before delivery.
4. Engineers installation and training service overseas.
100 T/H Dry Blower for Gold Mining with High Efficiency and Reliable Performance

 
FAQ

FAQ

Q1: What about the delivery?

       We can offer our gold trommel by containers or bulk ship, it completely depends on client's request and we are willing to provide best service for each of our clients.

Q2: What is the warranty?
       We provide 1 year warranty and free repair if quality problems emerge within warranty period.

Q3: What's the payment method?
       We can accept T/T, L/C, WESTERN UNION and so on.

Q4: Do you have your own factory or just a trading company?
       We do have our own factory and we welcome our clients to visit our factory in person. 

Q5. Whether it can be customized according to customer requirements?
       Yes, we can design and manufacture according to customer's requirement and we offer different kinds of equipment for our clients to choose the most suitable one.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier